We use cookies to provide social media features and to analyse our traffic. See more about our use of cookies.

Our website is currently in beta, so please let us know what you think.

This apprenticeship standard is in development and is not yet ready to use

Why is this apprenticeship not ready for delivery?

An apprenticeship standard is only available for delivery when both the standard and assessment plan is approved and a funding band (core government contribution) has been assigned to the standard.

How can I get involved?

If you'd like to get involved and contribute to the development of this standard, please read about developing standards and assessment plans. You can email the trailblazer contact using the details on this page.

Reference Number: ST0388

Details of standard

This apprenticeship standard is currently in development and its contents are subject to change

Occupation summary

This occupation is found in the Construction and Built Environment industry including new-build, renovation and refurbishment.  It is a specialist contracting occupation largely involved in the construction of partitions, walls and ceilings.  The Interior Systems sector alone has over 35,000 operatives working on extremely diverse projects in hotels, schools, airports, football stadiums, hospitals, shopping centres.  However other projects may mean working on security controlled installations such as Military Bases which may never be seen or used by the public.  Interior Systems operatives have also played a major part in the construction on iconic structures which are known throughout the world and include Canary Wharf, the Olympic Stadium, Battersea Power Station and the Shard.

This is a fast growing sector with many opportunities for career progression into site supervision and management position which can lead to running their own businesses.

The broad purpose of the occupation is to install, repair and maintain various elements of the internal structure of a building to a high standard.  (e.g. ceilings above and walls around the structure.)

In their daily work, an employee in this occupation interacts with other colleagues, other trades, site supervisor, site manager, end users, main contractors and suppliers.  Environments could range from internal and external construction sites to occupied buildings eg large commercial properties or residential tower blocks with apartments and specialist buildings such as car showrooms.  The work would usually be during normal weekday hours but unsocial hours may also be necessary.  The work will be physically active, including lifting and fixing systems into place.  Work could be at height from a platform or mobile scaffold and operatives will need to follow strict safe working practices at all times in whichever occupational area they choose. They will report to a supervisor or site manager and be capable of managing their own time, quality and resources to meet deadlines and specifications. 

This is a core and options standard with two pathway routes with – :

  1. Drylining - methods to install different drylining systems that form the walls and rooms within a building, often used to hide wires and pipes whilst improving acoustics and create space for insulation.
  2. Ceiling and Partitions.- incorporates different ceiling and partition systems within a building. Used to provide different types of working environments, taking account of lighting and other fixtures.

Core occupation duties

Duty

Criteria for measuring performance

KSBs

Duty 1 Interpret drawings to ensure work is completed to specification

Work is delivered in line with specification

K1, K2, K3, K4, K5, K6, K7, K8, K9

S1

B1, B2, B3, B4, B5, B6


Duty 2 Keep work area clean and tidy

Clean and tidy workspace is evidenced and planned in as standard

K1, K2, K3, K4, K5, K6, K7, K8, K9, K10

S1,S2, S3, S4, S5, S6, S7, S8, S9, S10, S11

B1, B2, B5 


Duty 3 Measure and mark out interior systems projects in accordance with industry standards

Delivered in line with customer and company expectations on time, accurately and with efficient product utilisation in line with industry standards.

K1, K2, K3, K4, K5, K6, K7, K8, K9, K10

S9, S10, S11, S12, S13, S14, S15, S16

B1, B2, B3, B4, B5, B6


Duty 4 Install metal furring ceilings and bulkheads in accordance with specification & manufactures instructions

Demonstrate capability within accuracy and in a timely manner

K1, K2, K3, K4, K5, K6, K7, K8, K9, K10, K11

S1,S2, S3, S4, S5, S6, S7, S8

B1, B2, B3, B4, B5, B6



Duty 5 Install plasterboard partitions in accordance with specification & manufactures instructions

Demonstrate capability within accuracy and in a timely manner

K1, K2, K3, K4, K5, K6, K7, K8, K9, K10, K11, K12

S1,S2, S3, S4, S5, S6, S7, S8, S9, S10, S11, S12, S13, S14, S15, S16

B1, B2, B3, B4, B5, B6


Duty 6 Complete quality assurance checks in accordance with specification to enable handover in line with site procedures

Deliver in line with customer and site specifications

K1, K2, K3, K4, K5, K6, K7, K8, K9, K10

S1,S2, S3, S4, S5, S6, S7, S8, S9, S10, S11, S12, S13, S14, S15, S16

B1, B2, B3, B4, B5, B6

Option duties

Duty

Criteria for measuring performance

KSBs

Option duty

1Install and repair metal stud partitions according to/in accordance with design details, specification, manufactures recommendations and best practice guidelines

 

Evidence the ability to install accurately in line with specifications, manufacturers requirements and FIS best practice guides

K1, K2, K3, K4, K5, K6, K7, K8, K9

S1,S2, S3, S4, S5, S6, S7, S8, S9

B1, B2, B3, B4, B5, B6






Option duty

2Install and repair Framed wall linings Eg metal dryliner channels, metal wall furrings, timber battens

 

In line with specifications with a focus on speed, accuracy and productivity

K1, K2, K3, K4, K5, K6, K7, K8, K9

S1,S2, S3, S4, S5, S6, S7, S8, S9

B1, B2, B3, B4, B5, B6



Option duty

3Install plywood pattresses according to specification & manufactures instructions

 

In line with specifications with a focus on speed, accuracy and productivity

K1, K2, K3, K4, K5, K6, K7, K8, K9

S1, S2, S5, S7, S8, S9

B1, B2, B3, B4, B5, B6


Option duty

4Form framed and frameless beam and column in accordance with specification & manufactures instructions.

 

In line with specifications with a focus on speed, accuracy and productivity

K1, K2, K3, K4, K5, K6, K7, K8, K9

S1, S2, S3, S5, S6, S7, S8

B1, B2, B3, B4, B5, B6


Option duty

5Form builders works holes and openings for windows and doors

 

In line with specifications with a focus on speed, accuracy and productivity

K1, K2, K3, K4, K5, K6, K7, K8, K9

S1,S2, S3, S4, S5, S6, S7, S8, S9

B1, B2, B3, B4, B5, B6




Option duty

6Form junctions, abutments and angles according to specification & manufactures instructions

 

Delivered accurately and in line with customer expectations

K1, K2, K3, K4, K5, K6, K7, K8, K9

S1,S2, S3, S4, S5, S6, S7, S8, S9

B1, B2, B3, B4, B5, B6




Option duty

7Recycle waste to contribute to zero/low carbon outcomes in the built environment

 

Appropriate usage and disposal of all materials onsite

K1

S1

B1, B2, B3, B4, B5, B6



Option duties

Duty

Criteria for measuring performance

KSBs

Option duty

1Install and relocate modular demountable partition systems in accordance with manufacturers guidelines and specification

 

In line with specifications with a focus on speed, accuracy and productivity

K1, K2, K3, K4, K5, K6, K7

S1, S2, S3, S4, S5, S6, S8



Option duty

2Fit doors, doorsets, and ironmongery, fix trims/mouldings, form junctions

 

In line with specifications with a focus on speed, accuracy and productivity

K1, K2, K3, K4, K5, K6, K7

S1, S2, S3, S4, S5, S6, S8

B1, B2, B3, B4, B5, B6




Option duty

3Fit integral glass, frames, trims and mouldings, install glass panels and blinds’

 

In line with specifications with a focus on speed, accuracy and productivity

K1, K2, K3, K4, K5, K6, K7

S1, S2, S3, S4, S5, S6, S8

B1, B2, B3, B4, B5, B6




Option duty

4Install suspended ceiling systems eg

  • Proprietary suspended ceilings and carry out repairs
  • Concealed and exposed mineral and/or metal grid ceilings
  • Metal and/or mineral plank ceilings
  • Rafts and/or acoustic baffle sections

 

In line with specifications with a focus on speed, accuracy and productivity

K8, K9, K10

S7, S9, S10, S11, S12, S13

B1, B2, B3, B4, B5, B6



KSBs

Knowledge

K1 General principles of building design and regulation particularly in relation to interface with internal construction. Including:

  • how fire spreads through a building and how to impede it and protect the structure,
  • noise nuisance, noise transfer, noise reverberation and to reduce it with improved acoustics
  • vibration and how to reduce it
  • the need for air and water barriers (Vapour Control Layer’s (VCL) and Damp Proof Membrane’s (DPM)) to seal a building, how these work, materials used and where they are found )

K2 The different methods to install dry lining systems to metal and stud partitions framed wall linings, framed and frameless beam and column encasements

K3 The importance of health and safety, how to work safely, including working at height and use of access equipment (e.g scissor lifts, Mobile towers) asbestos awareness and manual handling. The appropriate additional Personal Protective Equipment (PPE) which may be required for various tasks eg cutting metal, drilling, shot-firing

K4 The purpose and importance of risk assessments, method statements and Control Of Substances Hazardous to Health (COSHH) assessments.

K5 How to calculate quantity, length, area and wastage from sources such as setting out drawings, using BIM, digital working and Computer Aided Drawing (CAD).

K6 How to identify suitable materials, components, equipment and resources in accordance with project specification (e.g. fire, acoustics, deflection requirements)

K7 The tools, equipment, plant and machinery appropriate for use in each project type.  e.g. scaffold, Mobile Elevated Work Platforms (MEWPs), nail gun, circular saw, lasers

K8 The industry standards which cover the interior systems sector including BS 5234-1:1992, BS 8000-0:2014, BS 8000-8:1994, BS EN 13964:2014 and FIS Best Practice Guidelines

K9 How to utilise materials in accordance with manufacturer’s instructions.

K10 The importance of clean and tidy environment and the impact on zero/low carbon outcomes in the built environment.

K11 The importance of occupational health mental health and how to deal with stress and conflict, inherent in the workplace, eg drugs and alcohol, face fit testing, dust, noise, vibration, asbestos

Skills

S1 Measure and set out from drawings provided and check vertical and horizontal datum.

S2 Select the appropriate materials, tools and equipment in accordance with the specification requirements and or manufacturer specific instructions.

S3 Safely and correctly operate tools and equipment, plant and machinery appropriate for use.  (e.g. scaffold, MEWPS, nail gun, circular saw, lasers )

S4 Apply fire and acoustic mastic seals in accordance with specification, designs details and manufacturers recommendations

S5 Accurately measure and cut components (e.g. metal sections, plasterboard, insulation, timber and plywood)

S6 Appropriately fix all components according to specifications and/or drawings.

S7 Effectively protect surround surfaces and segregate work areas and cutting areas.

S8 Install dry lining systems to metal and stud partitions framed wall linings, framed and frameless beam and column encasements.

S9 Clearly communicate with management, customers and colleagues including other trades onsite.

S10 Maintain a clean and tidy environment, appropriately disposing of waste according to site procedures.

S11 Identify and select appropriate PPE for the task

S12 Install pattresses

S13 Install insulation

S14 Form service penetrations through partitions

S15 Install primary channels or main runners to line and level. Cut to length

S16 Frame and fit access panels

Behaviours

B1 Safety first approach

B2 An attention to detail

B3 Be able to work with others applying the principles of equality and diversity

B4 Focus on timekeeping and productivity

B5 Ability to work alone taking responsibility for completing of designated work in agreed schedule

B6 Working towards high quality of all work completed with an understanding of impact of defects

Qualifications

English and Maths qualifications

Apprentices without level 1 English and maths will need to achieve this level and apprentices without level 2 English and maths will need to take the tests for this level prior to taking the end-point assessment. For those with an education, health and care plan or a legacy statement, the apprenticeship’s English and maths minimum requirement is Entry Level 3. A British Sign Language (BSL) qualification is an alternative to the English qualification for those whose primary language is BSL. 

Additional details

Occupational Level: 2
Duration (months): 24

Review

This standard will be reviewed after three years.

 


Crown copyright © 2017. You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. Visit www.nationalarchives.gov.uk/doc/open-government-licence

Status: In development
Proposal approved Standard approved Assessment plan approved
Level: 2
Reference: ST0388
Route: Construction
Trailblazer contact(s): helen@tapperinteriors.co.uk
Employers involved in creating the standard: The FIS, 4M, Stanmore Ltd, Aspect Ceilings, Astins, Overbury, LCP Ltd, HBF, Stortford Interiors, Measoms, CITB, Taylor Hart, Macs, Roseville Contracts